What We Do

Services

Here's the full range of deck work we handle, from a first-time build to fixing what someone else got wrong.

Home › Services

Everything we take on

Every job below is one we do ourselves across Atwater.

Deck Installation

We set footings below frost depth, which is overkill for Atwater's mild winters but keeps posts from heaving in our clay soil. Joists go in at 16 inches on center, tighter at 12 inches if you want composite decking or a hot tub on top.

Custom Deck Design

We'll draw the layout around how you actually use the yard, not a stock rectangle off a plan. Multi-level decks, built-in benches, a sunken fire pit area, we lay it out on paper first so you're not deciding on a railing height while we're already framing.

Deck Repair

Soft boards, wobbly railings, ledger boards pulling away from the house, we see all three constantly in houses built here in the 80s and 90s. We replace what's rotted and check the flashing behind the ledger, because that's usually what let water in to begin with.

Composite Decking Installation

Composite boards don't warp or splinter, which matters when your deck sits in full sun from May through September. We still frame it in pressure-treated lumber underneath, since composite still sits on solid joists, it's not structural on its own.

Deck Staining & Sealing

A wood deck in Atwater takes a beating from UV, not rain, so the finish fails from the top down, not the edges. We pressure wash, let it dry a full day, then apply a penetrating stain instead of a film-forming one that'll just peel in a year.

Deck Railing Installation & Repair

Code calls for 36 inches minimum and balusters spaced so a 4-inch sphere won't pass through, and we build to that whether it's a repair or new construction. Loose posts usually mean the lag bolts rusted or were never bolted to blocking in the first place.

Deck Resurfacing

If the frame is solid but the boards are cupped, splintered or just faded past saving, we strip the decking and leave the structure alone. It's half the cost of a full rebuild and the deck is usable again in two or three days.

Deck Demolition & Removal

Old deck comes out board by board, not with a sledgehammer through your flower bed. We check what's underneath too, because sometimes the old footings aren't where you'd expect, and that changes the new layout.

Pergolas & Covered Decks

A bare deck in a Merced County summer is unusable by two in the afternoon, so a lot of our clients add a pergola or a solid roof over at least part of it. We frame it to carry real shade cloth or polycarbonate panels, not just rafters with nothing on them.

Deck Framing & Footing Repair

If a deck feels bouncy or one corner's sinking, the problem is usually a footing that was never poured below grade or a beam that's undersized for the span. We jack the deck, pour a proper footing, and swap the beam if it's not rated for the load it's carrying.

How It Works

Four steps, and no surprises in any of them.

01

We come and look

You tell us what you want doing, we look at what is actually there, and we ask the awkward questions early.

02

You get a price

In writing, itemised, free. If something might add cost later we flag it now rather than at the end.

03

We do the work

Same crew throughout. We cover your floors, keep the dust down and tidy up before we leave each day.

04

We walk it with you

You point out anything you are not happy with and we fix it before the invoice, not after.

Where We Work

All of this, across Atwater, CA

We bring the same crew and the same materials to every town on this list.

Atwater, CA
Modesto, CA
Merced, CA
Turlock, CA
Madera, CA
Ceres, CA
Los Banos, CA
Patterson, CA
Chowchilla, CA
Livingston, CA
Delhi, CA
Common Questions

Things worth asking

Questions that come up once a deck project actually gets underway.

Do I need a permit for a new deck?
Merced County requires a building permit for any deck higher than 30 inches above grade, and often for decks attached to the house regardless of height. The permit process includes a plan check and at least one inspection before the decking goes down over the frame.
How long does a deck project take?
A standard single-level deck of 300 to 400 square feet usually takes one to two weeks from the first footing to the final board, weather and permit inspections allowing. A multi-level deck, a pergola addition, or custom stair work can stretch that to three or four weeks.
Can you build within my budget?
A deck budget shapes material choice more than square footage, since pressure-treated pine runs roughly half the cost per square foot of composite decking. A contractor should price out two or three material options at the estimate stage rather than defaulting to the most expensive one.
Do you guarantee your work?
Workmanship on a new deck should carry at least a one to two year warranty covering framing and installation defects, separate from the manufacturer's warranty on composite decking or hardware. Ask specifically what's covered, since a warranty that only covers materials and not labor leaves the homeowner paying for a callback.
Who will I be dealing with during the job?
On most residential deck jobs, the homeowner deals directly with the crew lead or the contractor running the job, not a separate office scheduler. That's worth confirming upfront, since miscommunication between a sales rep and the crew is a common source of change-order disputes.
What decking materials do you work with?
Deck builders commonly work with pressure-treated pine, cedar, redwood and composite decking such as Trex or TimberTech. Pine costs less and must be restained every two to three years in strong sun, while composite costs more upfront but only calls for occasional washing.
Can I still use my yard while the deck is being built?
Most of a deck's yard is still usable during construction, since the work stays confined to the footprint of the new structure and a small staging area for lumber. Expect limited access to that section of the yard for the full build, plus noise from saws and a nail gun during work hours.
How should I prepare my yard before work starts?
Clear furniture, planters, and anything breakable from the area where the deck will go and from the path equipment will take to reach it. Mark or move sprinkler lines and buried cable if their location isn't obvious, since footing holes commonly run two to three feet deep.
What if you find a problem once the old deck comes down?
Rotted ledger boards, undersized beams, or footings that were never poured to code are common finds once an old deck comes off. A contractor should stop, show the homeowner what was found, and price the fix separately before continuing, rather than building over a problem.
How do I maintain a new deck?
A wood deck should be cleaned and resealed every one to three years depending on sun exposure, with Valley heat on the harder end of that range. Composite decking only calls for periodic washing with soap and water, but railings and fasteners on either material should get a yearly check for loose or rusted hardware.

Not sure what you need?

Describe the problem and we will tell you what it probably is. No obligation.

Call (559) 560-9236